Home Decoration Product System
Healthy to live in 8hours
Category: Emulsion Paint-Interior Wall Primer
Return to list
Angel Primer

Made from select superior raw materials through strictly controlled processes, the product is free of formaldehyde, benzene and other VOCs and can deliver an all-new efficiency and odorless experience. Featuring high permeability, it can seal and reinforce the substrate and provide thorough wall protection.

The product has passed UL GREENGUARD Gold Certification, French Indoor Air Emissions A+ Certification and China Green Product Certification, and meets the more stringent Health+ Water-Based Coating Standard, thus providing better home protection. It is a superior product with good environmental friendless and functionality and a good supporting product for high-end coatings.


Tel:+86 0594 2761989
Certifications

普通(过绿标).png

Product Profile

The 3TREES Angel Primer is a high-quality interior wall primer with superior emulsion as the aggregate. Made from select superior raw materials through strictly controlled processes, the product is free of formaldehyde, benzene and other VOCs and can deliver an all-new efficiency and odorless experience. Featuring high permeability, it can seal and reinforce the substrate and provide thorough wall protection. The product has passed UL GREENGUARD Gold Certification, French Indoor Air Emissions A+ Certification and China Green Product Certification, and meets the more stringent Health+ Water-Based Coating Standard, thus providing better home protection. It is a superior product with good environmental friendless and functionality and a good supporting product for high-end coatings.


Scope of Application

It is widely used in the interior wall decoration and protection of villas, hotels, hospitals, schools, office buildings and homes.


Product Nature

Main ingredients: Water, pigment, filler, emulsion and auxiliaries.


Product Features

Super Healthy, Super Caring

3TREES Health+ Water-Based Coating Standard

China Green Product Certification

UL GREENGUARD Gold Certification 

French Indoor Air Emissions A+ Certification

China Environmental Labelling Product Certification


Outstanding Functions and Better Odor Performance

Green formula and select superior raw materials to minimize odor 

No added VOCs, formaldehyde or benzene substances


Quality Primer for In-Depth Wall Protection

Strong resistance to alkali

Outstanding sealing performance 

Big coating area

Efficient resistance to mold

High adhesion 

Easier application

Application

Application instructions: The surface must be clean, dry, neutral, flat, and free of floating ash, oil stains and foreign substances. Water-leaking positions must undergo waterproof treatment. Before coating, the surface should be polished and leveled to ensure that the surface humidity of the pre-coated substrate is <10% and the pH value is <10. Paint surface effect depends on substrate flatness.


Application conditions: Wall temperature ≥ 5 ℃, humidity ≤ 85%, well-ventilated.


Application method: Brushing, rolling, or spraying.


Dilution ratio: Dilute with clean water. It is recommended that the dilution ratio should not exceed 20% (weight ratio).


Theoretical paint consumption: 12-14m2/L/round (paint film is calculated as 30μm, and actual consumption varies slightly with substrate roughness and porosity).


Recoating time: Surface drying 30-60 minutes, hard drying 2 hours and recoating interval between the product and topcoat 2-3 hours (which may be duly extended under low-temperature and high-humidity conditions).

 

Maintenance time: 7 days / 25℃, which may be duly extended under low-temperature, high-humidity conditions to obtain a solid film effect. In the process of paint film maintenance and daily use, it is suggested that doors and windows should be closed for dehumidification in high humidity weather (such as Wet Spring and Plum Rain)

 

Substrate Treatment:

  1. New wall: Thoroughly remove surface dust, oil stains, loose plaster, etc., and repair any holes to ensure that the wall surface is clean, dry and smooth.

  2. Re-painting wall: Thoroughly remove the original paint film and putty layer, clean surface dust, and level, polish, clean and thoroughly dry the surface, so as to avoid problems left over from the old wall (odor, mildew, etc.) affecting the application effect.

*Before coating, the substrate should be checked; coating can only start after the substrate passes acceptance inspection.


Coating System:

Substrate treatment (3TREES substrate treatment product series) - primer (3TREES Angel Primer) - apply 1 round - topcoat (3TREES BB Paint, 3TREES Space Paint, Kids Health Paint or other high-end paints) – apply 2 rounds


Tool Cleaning:

After or between applications, please clean the tools with clean water in time in order to prolong tool life. The packaging bucket can be recycled after cleaning, and packaging waste may be recycled for reuse.

Attention
  1. This product should be sealed and stored at 0-40℃ in a cool and dry place and away from exposure to the sun.

  2. Refer to the product label for production date, batch number and expiration date.


地址查询
专卖店授权号查询
Leave Your Message