Home Decoration Product System
Healthy to live in 8hours
Category: Auxiliary Materials-Putty Powder
Return to list
Featured
Fresh Breath Interior Water-Proof Putty

Water resistant,

Highly adhesive,

Easy to polish and apply,

Meets Health+ standard


Tel:+86 0594 2761989
Product Profile

This is a high-end putty product made from quality emulsion powder and various other powders. It is of a fine texture, high adhesion and water resistance, and easy to apply.

Meets Enterprise Health+ Standard Q/SKSP 038

  1. VOC: ≤5g/kg (powder), about 1/3 of the national standard, and about 1/2 of the China Environmental Protection Industry Standard;

  2. Free formaldehyde: ≤5mg/kg, about 1/10 of the China Environmental Protection Industry Standard;

  3. Benzene, toluene, ethylbenzene and dimethylbenzene are not detected;

  4. Heavy metals: with limits superior to the national standard and the China Environmental Protection Industry Standard.


Standard

JG/T 298 Interior Putty N


Application

Substrate Treatment

  1. The substrate layer should be solid, flat, and free of dust and stain. Any flaking or peeling shall be removed (Any construction glue, plaster powder, or paper strip mixed lime mortar applied to the substrate must be completely removed).

  2. Holes and hollows on or in the wall shall be dealt with; seams between calcium silicate board, gypsum board or wood board and the wall, or seams between boards shall be filled.

  3. Seams between calcium silicate board, gypsum board or wood board and the wall, or seams between boards shall be filled.


Mixing

Dilute the putty powder (putty: water=10:3-3.5), stir fully for ten minutes to produce a paste, leave it for five minutes, stir again and apply. Water that contains acid, alkali or salt shall not be used for dilution. The paste shall be used within two hours (in a temperature of 25℃), and paste already dried cannot be mixed with water and used again. 


Scraping

Use a steel scraper and scrap for several times, each time with a maximum thickness of 2mm, preferably 1mm. The whole putty layer shall not exceed 3mm. A second scraping can start when the previous one dries. Polishing and painting can only be carried out after the putty layer is completely dry.


Instructions
  • Temperature for application: 5℃-35℃

  • Theoretical amount: 1.0-1.8kg/㎡, varying according to substrate conditions

  • Storage: in a cool, clean, dry place


地址查询
专卖店授权号查询
Leave Your Message