It is a high-quality interior wall primer made of strictly selected quality raw materials and is refined by automatic production process. The product is odorless and environmental-friendly, bringing you fresh ambient air. It also features strong alkali resistance, efficient sealing, good adhesion, and easy application, providing multi-faceted protection for your home walls. Please use this product together with 3TREES topcoat products to build a better home environment.
It is a high-quality interior wall primer made of strictly selected quality raw materials and is refined by automatic production process. The product is odorless and environmental-friendly, bringing you fresh ambient air. It also features strong alkali resistance, efficient sealing, good adhesion, and easy application, providing multi-faceted protection for your home walls. Please use this product together with 3TREES topcoat products to build a better home environment.
Super Healthy, Super Caring
Odorless and environmental-friendly
Alkali resistance
Good adhesion
Efficient sealing
Easy application
Application instructions: The surface must be clean, dry, neutral, flat, and free of floating ash, oil stains, and foreign substances. Water-leaking positions must undergo waterproof treatment. Before coating, the surface should be polished and leveled to ensure that the surface humidity of the pre-coated substrate is less than 10% and the pH value is less than 10.
Application conditions: Wall temperature ≥ 5°C, humidity ≤ 85%, well-ventilated.
Application method: Brushing, rolling, or spraying.
Dilution ratio: Dilute with clean water to a proper viscosity. It is recommended that the dilution ratio should not exceed 20% (weight ratio).
Theoretical paint consumption: 12–14 m²/L/round (rolling) (paint film is calculated as 30 μm, and actual consumption varies slightly with the roughness and porosity of substrate).
Recoating time: Surface drying for 30–60 minutes, recoating at an interval of 2–3 hours (which may be duly extended under low-temperature and high-humidity conditions).
Maintenance time: 7 days/25°C, which may be duly extended under low-temperature (not lower than 5°C) and high-humidity conditions to obtain solid paint film. In the process of paint film maintenance and daily use, it is suggested that doors and windows should be closed for dehumidification in high humidity weather (such as Wet Spring and Plum Rain).
Substrate treatment:
1. New wall: Thoroughly remove surface dust, oil stains, loose plaster, etc., and repair any holes to ensure that the wall surface is clean, dry and smooth.
2. Re-painting wall: Thoroughly remove the original paint film and putty layer, clean surface dust, and level, polish, clean and thoroughly dry the surface, to prevent the problems left over from the previous wall (odor, mildew, etc.) affecting the application effect.
*Before coating, the substrate should be checked. Coating can only start after the substrate passes acceptance inspection.
Coating system:
For best effect, please use this product together with 3TREES one-stop wall decoration solutions.
Substrate treatment (3TREES substrate treatment product series) – primer (odorless alkali-resistant multi-function primer, one round) – topcoat (3TREES wall paint series, two rounds)
Tool cleaning:
After or between applications, please clean the tools with clean water in time to prolong the service life of tools.
The packaging bucket can be recycled after cleaning, and packaging waste may be recycled for reuse.